Exercise # 11 - IELTS Hello there! Could everyone help me out with correcting this writing, please? I haven't attached the diagram in this case because I haven't on hand. Thank you in advance. The diagram outlines the different stages involved in the production of bricks for the building sector. Overall, the process comprises sevens steps, beginning with the digging up of the clay and culminating with the brick delivery. To begin with, the first stage generates the raw material, by digging up the clay, which is placed onto a metal grid. The clay is broken up into smaller pieces that are transporting next to the subsequent step with the help of a roller. Then, sand and water are added to those pieces to manufacture the brick through either a wire culter or a mould. The following stage consists of putting the bricks into an oven to be dried for a period of 24-48 hrs. Later, dried bricks are located into a kiln to be exposed at two instances of 'cooking'. Firstly, bricks are disposed at a moderate temperature ranging from 200º C to 980º C and then at higher temperatures between 870º C and 1300º C. Next, the bricks are sent to a cooling chamber for 48-72 hrs. Finally, bricks are packaged to be delivered to whom corresponds.

Corrections · 2

1

Exercise # 11 - IELTS

Hello there! Could someone help me out with correcting this writing, please? I haven't attached the diagram in this case because it is not to hand. Thank you.

The diagram outlines the different stages in the production of bricks for the building sector. Overall, the process comprises seven steps, beginning with digging up the clay and culminating with the brick delivery.

To begin with, the first stage generates the raw material, by digging up the clay. This is then placed onto a metal grid. The clay is broken up into smaller pieces and placed on a roller. Sand and water are added to these pieces to manufacture the brick passing through either a wire cutter or a mould.

The following stage puts the bricks into an oven and dries them for 24-48 hrs. Later the dried bricks are placed in a kiln to be 'cooked' twice. Firstly, bricks are heated to a moderate temperature between 200º C to 980º C, and then to a higher temperature between 870º C and 1300º C. Next, the bricks are sent to a cooling chamber for 48-72 hrs. Finally, the bricks are packaged for delivery.

Very well written!

Want to progress faster?

Join this learning community and try out free exercises!

Don’t miss out on the opportunity to learn a language from the comfort of your own home. Browse our selection of experienced language tutors and enroll in your first lesson now!

Start Learning Today