Homework (mining topic)
I have to present something in my class, it's about tunneling. I wrote something but I want to know if I am right, made a mistake or I can say the same in a better way.
-The side drift method involves the excavation of two predriven side drifts with the subsequent placement of a concrete lining. the latter serves as a foundation for the lining in the heading. The placement of the invert arch, it means, the closure of the lining follows inmediately after the excavation of the core.
Search from various English teachers...
Corrections · 0
Don’t miss out on the opportunity to learn a language from the comfort of your own home. Browse our selection of experienced language tutors and enroll in your first lesson now!
Start Learning Today
